Gallery - Gallery 2

img_1752.jpg
350t and 100t placing roof at BP Wanganui
img_1702.jpg
350t placing new silos at Fonterra Pahiatua
img_1722.jpg
60t standing roof trusses at Massey
img_1640.jpg
Carting 4 large pipes from galvanising plant in Hamilton
img_1615.jpg
Two 30t Cranes lifting roof trusses
img_1438.jpg
30t placing new billboard
img_0329_12.jpg
Lifting a 115 tonne boat into the river at Foxton Beach
top_on_boat_14.jpg
Lifting the top on a 26m catamaran at Foxton Beach
top_on_boat_2_92.jpg
Lifting the top on a 26m catamaran at Foxton Beach
honeypot@spinningplanet.co.nz